Our Projects
We work with each client to design a solar energy system that meets their specific energy needs and budget.
Key Learnings | Highlights:
In response to Pope Francis’ Encyclical Letter – Laudato Si’, which recommends countries transition their infrastructure to renewable energy sources. The National Shrine of Saint Padre Pio decided to transition its facility from traditional electricity to solar energy.
They started this transition by installing a 30kWp Grid-tie System that can potentially save monthly of 23,700 – 53,100 pesos, while at the same time helping the environment by reducing 68 metric tons of carbon dioxide, which is equivalent to planting 3,124 trees, in the next 30 years! The National Shrine of Saint Padre Pio is the perfect example of how the Church can be a leader in environmental stewardship while also being good stewards of their finances.
Now they are taking the step towards sustainability!
30kWp Grid-tie System
National Shrine of St. Padre Pio Church
Location: Sto. Tomas, Batangas
Brief Overview of the Project: Advocates for more sustainable energy sources.
Panels installed: 50 x 600W Solar Panels
Potential Monthly Savings: P23,700 – P53,100


Key Learnings | Highlights:
With decades of experience in the industry, this Batching Plant took a proactive step towards a cost-effective energy source and became less dependent on utility grid.
This batching plant installed a 50kWp Grid-tie System that can potentially save monthly of 49,890 – 89,200 pesos which significantly reduces its electricity costs. By showing their commitment to sustainability and environmental responsibility, this move towards solar energy is a positive development to inspire other companies in the industry to follow suit, further establishing itself as a leader.
Using solar power is a relatively new and innovative technology in the batching plant industry.
50kWp Grid-tie System
Batching Plant
Location: Batangas
Brief Overview of the Project: Reduce electricity.
Panels installed: 95 x 530W Solar Panels
Potential Monthly Savings: P49,800 – P89,200


10.8kWp Hybrid System
Camp Sandugo
Location: San Mateo, Rizal
Brief Overview of the Project: Frequent power outages
Panels installed: 24 x 450W Solar Panels
Potential Monthly Savings: P10,900 – P19,100
Maintenance: X
Key Learnings | Highlights:
Comfortable for the guest

60kWp Grid-tie System
RMR Electric Corporation
Location: Antipolo City
Brief Overview of the Project: Reduce electricity. Maximized weekend solar harvest thru net metering
Panels installed: 100 x 550W Solar Panels
Potential Monthly Savings: P59,400 – P106,200
Maintenance: X
Key Learnings | Highlights:

59kWp Grid-tie System
Floating Sanctuary Resort
Location: Bulacan
Brief Overview of the Project: Comfort of guests / Upon during downtimes (confirm if w/ net metering)
Panels installed: 110 x 550W Solar Panels
Potential Monthly Savings: P59,400 – P106,200
Maintenance: X
Key Learnings | Highlights:
The guest peak at weekends.